PracticalStudent.com
|
|||
Technical Drawing - Exam Papers - Higher - 1998 - BuildingQuestion 7The accompanying drawing shows ground contours at five-metre vertical intervals. ABC is the line of a proposed roadway. The roadway has the following specification: (i) formation width is 15 m; On the drawing supplied, show the earthworks necessary to accommodate the roadway. |
|||